Instrument Fill Log (pdf)
The light switches are located:
1) Tunnel entrance - on the wall to your left just as you enter the tunnel. 2) Lower level arcade - at the end of the tunnel under the 3.5m telescope. 3) Intermediate level - at the entrance to the stairs leading up to the 3.5m observing level. 4) 3.5m Observing level - at the top of the stairs on the wall to your right (leftmost switch controls the incandescent lights).
(ALTERNATIVE method for pressurizing the nurse tank) This method should only be used with premission from Bill Ketzeback, as the black knob has been REMOVED for leaking purposes.
Main tank Remove brass cap from the bottom fill port on bottom of TSPEC (It is the most forward cap between the two aluminum spash shields). FILL TSPEC with the ports in the downward position only! Insert the LN2 fill hose from the front end under the instrument and insert the stinger into the fill port and secure with the threaded brass nut (DO NOT pre-cool/purge the line). Open the valve on the 180L LN2 tank and exhaust gas should start venting out of the copper tube at the rear of TSPEC. When liquid starts coming out of the vent tube, close off the 180L LN2 fill valve. Wait a minute or two for excess LN2 in the fill line to purge then remove the fill line. Be carefull of LN2 on the floor (kneeling in a puddle of LN2) and LN2 coming out of the fill line on your hands (Use LN2 gloves). DO NOT use excessive force on removing the fill line nut if frozen on (carefully use a heat gun to defrost instead). Replace the brass cap on the bottom fill port. Leave the cap on loosely (about 1/8 turn from tight). Put the 180L dewar back. Fill out the LN2 fill log sheet on the side of the storage cabinet where LN2 saftey equipment lives & update the white status board in the Ops building. Aux tank (every Monday afternoon) Rotate the instrument so the ports are facing upward. Remove brass cap from the rear-most fill port of TSPEC. Insert funnel into port. Fill funnel with LN2. LN2 will come out of port when full. Remove funnel, replace cap, and rotate instrument back to the downward position.
Main tank
Aux tank (every Monday afternoon)